E-Bus funding application 2025: Checklist and grants in review

Dominik Ashkar, CEO HEERO Motors vor HEERO Minibus

E-Bus funding application 2025: Checklist and grants in review

05/06/2025

8

Minutes

Max Knirsch

Product Expert

05/06/2025

8

Minutes

Max Knirsch, Product Expert at HEERO Motors

Max Knirsch

Max Knirsch

Product Expert

The German federal government launched a funding call for e-buses, the deadline for which ended on July 21, 2026. Applications had to be precise and complete in order to benefit from the grants. Our practical checklist shows what was important in the process and what matters for future calls.

The topic briefly and concisely

Project outlines for the e-bus funding had to be submitted by July 21, 2026, in order to receive up to 70% of the additional costs for vehicles and 40% for charging infrastructure.

The purchase of new battery and fuel cell buses, the retrofitting of diesel vehicles, and the necessary charging and maintenance infrastructure were subsidized.

Applications are evaluated in a competitive process, where CO₂ savings, cost-effectiveness, and the current level of electrification of the vehicle fleet are critical criteria.

Rising operating costs and strict emission regulations are forcing fleet operators to take action. The electrification of public and commercial passenger transport is no longer an option, but a strategic necessity. The Federal Government has set the course and supported this transition with a funding program that covered up to 80% of the additional investment costs for e-buses and charging infrastructure; the 2026 funding call ended on July 21, 2026. This guide provides you with a detailed e-bus funding application checklist for 2025 and explains what was most recently applicable regarding these subsidies. HEERO is by your side as an experienced partner, from submitting the application to putting your new, highly efficient e-fleet into operation.

Action Window 2025: Why the funding application was the right step back then

The past funding round was a clear signal from the Federal Government to accelerate the transition in transport. With the "Guideline for Promoting Alternative Drives of Buses in Passenger Transport", a proven instrument was continued. The call for funding ran from May 26 to July 21, 2026; the deadline for submitting project outlines has therefore expired. Transport companies that keep their documents well-maintained are better positioned in the competitive award procedure. In particular, operators with few or no electric buses in their fleet so far were given preferential consideration. The funding of up to 70% of the additional costs for a low degree of electrification, otherwise 55%, significantly reduced the investment barrier. This also enabled smaller municipalities and private bus companies to enter electromobility. We clarify which programs are currently open on a case-by-case basis.

The ultimate E-bus funding application checklist for 2025

An eligible application relied on completeness and precision. The Federal Ministry evaluated applications based on criteria such as CO₂ avoidance and electrification rate. The following checklist shows which points a project outline had to cover in previous funding calls:

  • Project description: Clearly define the objectives, the scope of procurement (number and type of buses), and the planned operational context (e.g., urban, regional, or factory transport).

  • Economic efficiency analysis: Present the additional investment costs of an electric bus compared to a reference diesel vehicle. This was the benchmark for calculating the funding rate; for background: funding rate of 80%.

  • CO₂ reduction potential: Calculate the expected reduction in greenhouse gas emissions over the entire service life of the vehicles. Since 2021, 830,000 tonnes of CO2 have already been avoided in this way.

  • Concept for charging infrastructure: Plan the required charging, refueling, and maintenance infrastructure. These costs were eligible for 40 percent funding under the bus program.

  • Schedule: Outline a realistic schedule from the tender (within 6 months after the decision) to the binding order (within 12 months).

  • Proof of eligibility to apply: Attach all necessary documents identifying you as an eligible transport company or operator.

The allocation of funds took place in a competitive process. The 2026 funding call for buses ended on July 21, 2026; a follow-up call has not been announced. We clarify which programs are currently open on a case-by-case basis.

More than just vehicles: promoting charging infrastructure as a success factor

A powerful fleet requires an equally powerful infrastructure. The funding program explicitly took this crucial aspect into account. The subsidies covered not only the acquisition of battery or fuel cell buses, but also the associated charging and refueling infrastructure. This includes depot charging solutions, fast-charging stations at terminals, and the necessary grid connection. The integrated planning of vehicle and infrastructure was a key criterion for a positive funding decision. HEERO supports you in developing a holistic electrification concept that is tailored precisely to your operational processes. This ensures that your new e-bus fleet operates with maximum efficiency and reliability from day one. Proper infrastructure planning secures the long-term profitability of your investment.

From sketch to award: The path through the application process

The process from the idea to the funding decision is clearly structured. The first and most important step was the submission of the project outline within the funding call; the 2026 call for buses ended on July 21, 2026. This is done exclusively via the online portal 'easy-Online'. After submission, the outlines underwent a competitive evaluation process. Here, the projects were evaluated and prioritized based on their climate impact, their degree of innovation, and their economic efficiency. Applications that demonstrated a high CO₂ reduction with the lowest possible funding requirement per ton of CO₂ saved had the best chances. A positive decision is the starting signal for concrete implementation. Within six months, the tender for the vehicles had to take place, and the binding order had to be submitted after twelve months at the latest. Professional preparation and support during the process were therefore essential in order to meet these tight deadlines.

HEERO as your partner: From application to practical test

The complexity of the funding application and the subsequent implementation can represent a challenge for many companies. HEERO offers you more than just state-of-the-art electric vehicles on a proven Sprinter basis. We see ourselves as your strategic partner for the electrification of your entire fleet. Our team of experts supports you at every step: from the creation of a convincing project outline to the detailed profitability calculation and the planning of the optimal charging infrastructure. We help you meet the requirements of the BMDV guideline and position your application for maximum success. Our patented conversion (Diesel-to-Electric) was also an eligible option that preserves existing special bodies and implements the principles of the circular economy. This protects investments made and accelerates the path to zero emissions. Working with us simplifies the process significantly.

Conclusion: Economic viability and sustainability through targeted support

The 2025 e-bus funding has concluded; the most recent funding call for buses ended on July 21, 2026. With subsidies of up to 70% of additional costs for low electrification levels, otherwise 55%, switching to electric drives was attractive not only in terms of emissions but also economically. Structured preparation using our e-bus funding application checklist remains the basis for any future call. HEERO accompanies you through the entire process as an innovative and pragmatic solution partner. We classify the subsidies for you and also deliver the appropriate, field-tested vehicle technology. Request your personal consultation or book an everyday test free of charge. Experience the performance and cost-effectiveness of our solutions yourself.

HEERO Motors. Electric solutions for real-world, high-demand use cases.

HEERO Motors GmbH, Kurfürstenstraße 1, 80801 Munich.

Social

© 2026 HEERO Motors. All rights reserved.

© 2026 HEERO Motors. All rights reserved.

© 2026 HEERO Motors. All rights reserved.